City of Chattanooga
Home|About Chattanooga|Jobs|Mayor's Office|City Council|Pay Online|GIS Map|Contact Us
  • :
: Construction / Commercial Development


Chattanooga Rainfall Intensity-Duration Frequency Curve
 (pdf 129KB)


Storm Water Best Management Practices Manual (6/2001)
This manual is available to print in sections in it's original appearance as PDF. 
Cover pages and Table of Contents.  (Note: First page will appear blank.  Please scroll down.)

1.    Purpose, Applicability, and Scope 
2.    BMP Guidelines
3.    Erosion and Pollution Control Plan
4.    BMP Specifications
    4.1    Check Dam
    4.2    Channel Stabilization
    4.3    Construction Exit
    4.4    Diversion
    4.5    Temporary Downdrain Structure
    4.6    Gabion
    4.7    Rock Filter Dam
    4.8    Retrofitting
    4.9    Sediment Barrier
    4.10    Inlet Sediment Trap
    4.11    Portable Sediment Tank
    4.12    Temporary Sediment Basin
    4.13    Temporary Stream Crossings
    4.14    Storm Drain Outlet Protection
    4.15    Surface Roughening
    4.16    Topsoiling
    4.17    Vegetated Waterway or Stormwater Conveyance Channel
    4.18    Buffer Zone
    4.19    Disturbed Area Stabilization (with Mulching Only)
    4.20    Disturbing Area Stabilization (With Temporary Seeding)
    4.21    Permanent Seeding
    4.22    Disturbed Area Stabilization (Sodding)
    4.23    Dust Control on Disturbed Areas

Appendix A - Chattanooga Stormwater Management Ordinances (as incorporated into City Code Article VIII Chapter 31; Stormwater Management Section begins on pg 83 [pdf])

Appendix B - Chattanooga Landscape Ordinance ( as incorporated into City Code Zoning Ordinances; begins on pg 172 [pdf])

Appendix C - This section has been reserved for Participating Local Community Stormwater Ordinances.  As of 4/2005 no other municipality has adopted Chattanooga's BMP manual.


Landscape Manual has moved to Codes, Permits & Inspections page.  (see left sidebar)

Residential Single and Two Family Construction Requirements
Construction Site Dos and Don'ts
Construction SOP

Stormwater Enforcement Protocol  (pdf 34KB)
     On August 9, 2004, the Chattanooga Stormwater Board passed temporary a Enforcement Protocol for Stormwater Management staff to employ regarding violations of the City's Stormwater Ordinance. This protocol will be employed by Staff until a permanent protocol can be approved. The Stormwater Board encourages your review and written comments regarding the protocol. Comments can be directed to:

Chattanooga Stormwater Management
ATTN: Stormwater Board
1250 Market Street, Suite 2100
Chattanooga, TN 37402

or by e-mail to SWM@mail.chattanooga.gov. Please list the subject as Enforcement Protocol. All comments should be received by Monday, September 13, 2004 at 3:00 p.m.

Enforcement Protocol Presentation, Stormwater Board Meeting, Monday, August 9, 2004 (pdf 1.2MB)


Guidance Manual for Storm Water Structure Maintenance  (pdf 1.5MB)

Land Disturbing Permit MONTHLY Inspection Report and Certification Form (pdf 46KB) to print, complete and mail or fax

Erosion and Sediment Inspector Manual  (pdf 150KB)

AGC Presntation 4/21/05 (Mounir Minkara)

311